|
Size:
Project Type:
Highlights:
- Site design currently includes permeable pavement in new parking lots as a method of properly treating surface storm water runoff.
- Existing storm water management system will be completely upgraded to include bmp’s and volume control.
- Historic construction project, not only for the Lorain City School District, but for the entire City of Lorain.
- Capstone of an 11-year, OSFC co-funded building program.
|  |
|